Waterproof Deck Coating
Deck Coating is typically a floating system, installed in a series of layers.   Consisting of a, slipsheet, fabric reinforced membrane, Neoprene latex protection layers followed by an acrylic topcoat. This process requires a curing time between each coating step, approximately one day per coating in a series of consecutive working days. Time frame is approximate.
More Photos
Roll over the thumbnails below to view the larger image.
 
 
 
 
           
Back
image
  image